Fact Sheet for Rhode Island Regulations BACK to VIRTUAL TOUR The following fact sheet was prepared by the ECAR Center staff. Once prepared, each ECAR Center fact sheet undergoes a review process with the applicable state environmental agency(ies). You can check on the status of the review process here. Please read the disclaimer on the status page. While we have tried to present a summary of the essential information on this topic, you should be aware that other items, such as local regulations, may apply to you. What You Need to Know
The Clean Water Act requires virtually every automotive salvage or recycling operator to obtain a stormwater permit. The exceptions to this rule are few, and they are explained further in the detailed information provided below. Therefore, if you own or operate a salvage or recycling operation and you do not currently have a stormwater permit, you most likely are out of compliance. The purpose of this fact sheet is to help you either to get into compliance or to assist you to develop a more efficient and effective compliance strategy. Rain or snow falling on your property can pick up contaminants as it runs off, and can carry the contaminants through drainage systems directly into streams, rivers, and lakes. The term "stormwater" refers to this type of runoff. In 1987, Congress mandated that "industrial" sites obtain stormwater permits. In 1990, EPA defined "industrial" to include, among many other types of sites, "salvage yards and automotive [recyclers]." [Title 40 CFR 122.26(b)(14)(vi)]. These mandates apply across the country, regardless of your state. Congress and EPA took this action because stormwater that comes in contact with metals, oil and grease, used batteries and tires, and other materials common at automotive recycling facilities may cause localized pollution that can affect the local community's ability to swim and fish in lakes, rivers, and streams. For example, the mercury that still may be found in old automotive switches or even some new parts is toxic to humans and to the fish they may catch and eat. By obtaining a stormwater permit, and more importantly, by taking some common sense actions under the permit to prevent stormwater contamination, you can provide your community with environmental benefits to compliment the value of recycling end-of-life vehicles. Although Congress and EPA created the national rules that provide the basic framework for stormwater regulations, the rules are implemented by the individual state environmental agencies. EPA may help certain states develop programs and it provides guidance to all states, but for the most part, you obtain a stormwater permit from your state environmental agency. Information about your state permit, compliance requirements, contact information, and other helpful hints are provided in the following pages of this site. The most important part of the compliance program is developing a stormwater pollution prevention plan, and this site will help you to develop such a plan. The key for you is to make sure that you implement the plan and adhere to your legal obligations.
How to Get Permit Coverage. Start by downloading and carefully reading the Notice of Intent (NOI) form and General Permit found below under "Links to the Regulations and Forms". To apply for coverage under the general permit, you must: 1. Prepare a Stormwater Pollution Prevention Plan (SWPPP) according to Part IV of the general permit that is to be implemented upon the date of your authorization to discharge. 2. Complete and submit a notice of intent (NOI) form, along with your SWPPP by certified mail to: R.I
Department of Environmental Management Unless notified by the director to the contrary within 90 days of the submittal of a complete NOI, your facility may commence stormwater discharges according to the terms of the general permit. 3. The general permit expires at midnight on March 19, 2004. If you wish to continue an activity regulated by the general permit after its expiration, you must apply for and obtain coverage under a new permit. To do so, you must submit a new application at least 180 days before the expiration of the existing permit. How to Comply with the Permit Requirements. To maintain coverage under the general permit, you must comply with all the terms of the permit. Below is a summary of key requirements. 1. A storm water pollution prevention plan (SWPPP) must be developed for each facility covered under the general permit. This plan must be implemented in order for your facility to be in compliance with the terms of the permit upon the date of authorization to discharge. The requirements of the plan are described in Part IV of the general permit. The SWPPP must be signed in accordance with Part V.G of the general permit must be retained on-site for at least five years and made available to the authorities upon request. 2. Update the SWPPP as necessary whenever there is a change in your operations that has a significant affect on stormwater. If the plan is reviewed by the Director, and is found to not meet one or more of the minimum requirements, you must amend the plan and submit a written certification to the Director that the changes have been made within 30 days after notification. 3. At least once a year, a comprehensive inspection must be performed to evaluate compliance with the SWPPP. The inspections must be performed in accordance with Part IV.E.3 of the general permit. A report summarizing the inspection and any actions taken to amend the plan must be prepared and retained on-site for at least five years. 4. Automotive recycling operations are considered "Class II Facilities" and are therefore required to collect and analyze samples of their stormwater at least one time each calendar year. The instructions for monitoring are contained in part II.B.5 of the permit. 5. Your facility must record the results of the annual monitoring on discharge monitoring report (DMR) forms and retain them on-site for at least 5 years. The DMRs must be submitted to the R.I. Department of Environmental Management (RIDEM). The report is due on January 15 for sampling conducted during the previous calendar year. Your SWPPP must include a description of potential sources of stormwater pollution and measures and controls, including best management practices (BMPs) that will be implemented at your facility to prevent or minimize stormwater contamination. When developing the SWPPP you must consider the use of certain BMPs that EPA and RIDEM consider applicable to specific areas such as vehicle dismantling/storage areas and fluids storage areas. For more specific information on developing a Pollution Prevention Plan, visit the ECAR SWPPP fact sheet. Links to the Regulations and Forms. Use the following links to view the regulations pertaining to stormwater management. Federal EPA National Pollutant Elimination Discharge System (NPDES) Stormwater Regulations When an inspector comes to your facility, there are certain things he or she checks to see if you are in compliance with environmental regulations. It makes good sense for you to perform a "self-audit" and catch and correct problems before they result in penalties. Also, there are some compliance incentives associated with self-audits (see Audit Policy Page). Use the following list to audit your stormwater permit.
Best Management Practices (BMPs) The following is a list of BMPs for auto salvage facilities identified by EPA when the stormwater regulations were published: Dismantling and vehicle maintenance:
Outdoor vehicle, equipment and parts storage:
Vehicle, equipment and parts washing areas:
Liquid storage in above ground containers:
Improper connection with storm sewers:
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||